Category: | General road environment: Other (infrastructure-related) |
Tags: | crossing, cycle, path |
Date time: | 1.55pm, Monday 29th August, 2011 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Brandon |
In the middle of the A11. This is an unassisted cycle crossing between Barton Mills and Tuddenham.
Bide your time!
Comments reflect the views of the original submitter only.