Category: | Cycleway: Other (infrastructure-related) |
Tags: | bearsway, cyclistsrejoincarriageway, entrance, park |
Date time: | 2.53pm, Friday 21st October, 2016 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bearsden |
The turn from Cluny Park into Cluny Drive, on the Bears Way interim route, with a "Cyclists Rejoin Carriageway" sign.
Comments reflect the views of the original submitter only.